Granite City C.U.S.D. #9 selected The Korte Company as their construction manager for the 205,888-square-foot renovation and new addition to their existing high school.

The renovation included extensive refurbishing and remodeling of electrical, mechanical and plumbing systems as well as replacement of all windows, doors, roofing, floor coverings, ceilings and interior finishes.

Phase One began with the installation of new cooling equipment for the cafeteria, demolition of an unused smokestack and removal of asbestos. The new addition included a library/media center, study hall, bus drop-off enclosure, locker corridor, new stairwells and an elevator.

The Korte Company provided construction management services on this project. Our innovative project delivery plan and phased scheduling allowed the school to remain in session during the 27-month construction period.

Project details

Let's talk

Get Build-Smart guidance from our experienced Design-Build team.

Let's talk
Get started
Project Details
Markets
  • Education
  • Renovations & Additions
Clients
  • Granite City C.U.S.D. #9
Architects
  • Huff Architectural Group
Services
  • Construction Management
Size
  • 205,888 square feet
Location
  • Granite City, IL
>

Offices

St. Louis
5700 Oakland Avenue
Suite 275
St. Louis, MO 63110
Phone: 314-231-3700
Fax: 314-231-4682
Highland
12441 US Highway 40
PO Box 146
Highland, IL 62249
Phone: 618-654-8611
Fax: 618-654-4999
Las Vegas
9225 W. Flamingo Road
Suite 100
Las Vegas, NV 89147
Phone: 702-228-9551
Fax: 702-228-5852
BUILDING EMERGENCY? CALL US 24/7 AT 618-654-8611
"I'D RATHER DRIVE NAILS THAN EAT." -RALPH KORTE