In this Design-Build project, we designed and constructed a U.S. Green Building Council LEED Certified Gold Armed Forces Reserve Center and Unheated Storage buildings. The Training Center is comprised of a two-story, conventional building situated around a central courtyard.

The Training Center includes classrooms, an assembly hall, mechanical and electrical rooms, locker rooms, a fitness room, a weapons simulator, control rooms, an armory and vault, and open and private offices on both the first and second floors.

We constructed the Unheated Storage building using a site-cast concrete exterior wall system, added a painted finish and installed a standing seam metal roof. The project includes the installation of a fire pump and two on-site, 20,000-gallon water storage tanks. The tanks in combination with the fire pump ensure the Air Force Reserve Command is protected in accordance with Unified Facilities Criteria and National Fire Protection Association fire suppression requirements.

Learn about all of our housing construction work here.

Project details

Let's talk

Get Build-Smart guidance from our experienced Design-Build team.

Let's talk
Get started
Project Details
USGBC Certification
  • LEED Certified Gold
Markets
  • Department of Defense
  • Education
Clients
  • U.S. Army Corps of Engineers
Architects
  • Michael Baker International
Size
  • 54,800 square feet
Awards
  • Coin of Excellence
Location
  • Juana Díaz, PR
>

Offices

St. Louis
5700 Oakland Avenue
Suite 275
St. Louis, MO 63110
Phone: 314-231-3700
Fax: 314-231-4682
Highland
12441 US Highway 40
PO Box 146
Highland, IL 62249
Phone: 618-654-8611
Fax: 618-654-4999
Las Vegas
9225 W. Flamingo Road
Suite 100
Las Vegas, NV 89147
Phone: 702-228-9551
Fax: 702-228-5852
BUILDING EMERGENCY? CALL US 24/7 AT 618-654-8611
"I'D RATHER DRIVE NAILS THAN EAT." -RALPH KORTE