The Korte Company was on hand for the ribbon-cutting ceremony at Maverick Technologies in Columbia, Illinois. The 35,000 square foot global headquarters is a two-story Design-Build facility. It features three simulation labs, a hardware integration facility, 30 offices and more than 80 workspaces.
According to Todd Korte, President and CEO of The Korte Company, “As a Design-Build company, the technical design of the Maverick facility fit well into our core strength area.”