b'I-215LOGISTICSCENTERThis year, we delivered the I-215 Logistics Center, a 400,801-square-foot distribution hub in North Las Vegas. Located on a 21-acre site near the I-15 and I-215 interchange, the project features a Tilt-Up facility with Type III-B construction. It also contains two truck courts and offers a clear height of 40 feet that can accommodate multiple tenants. A major part of the project required extensive sitework, including 3,000 lineal feet of power and 4,000 lineal feet of sewer connections. Notably, we installed 375 feet of steel casing under the Union Pacific Railroad tracks, requiring detailed coordination and constant monitoring. This was critical for maintaining the railroads integrity without disrupting continuous access for local residents.64'