b'CREECHAt Creech Air Force Base in Nevada, Phase 1 of theNAS Disaster
Resiliency Program (DRP) is currently under construction. Delivered under
a Design-Build contract, the project includes a 50,364-square-foot
SquadronPENSACOLA, FLAFB, NV Operations Facility, a 41,053-square-foot
AircraftThe Korte Company joined with PacWest on the Design-Build
Operations Facility, a Central Utility Plant and 280,000 square feet of
airfield pavementsstrengthening mission readiness, infrastructure
reliability and long-term resiliency at the installation. restoration of
Building 603 at Naval Air Station Pensacola. The project was part of the
Hurricane Sally Recovery Program for NAVFAC Southeast. We updated critical
infrastructure with new mechanical and electrical systems, structural and
envelope upgrades, and enhanced life-safety features.CREECH AFB PHASE
2Phase 2 of the Disaster Resiliency Program at Creech Air Force Base will
further expand the bases operational capacity. Planned as a Design-Build
project, the scope includes a 79,335-square-foot Aircraft Maintenance
Facility hangar, a 4,429-square-foot covered Aerospace Ground Equipment
storage yard, a 204-square-foot hazardous material storage facility and
100,167 square feet of airfield pavements. It is all designed to support
the evolving DRP mission sets.82 83'